Nissan EV charging cost page

Nissan Townstar EV Passenger L2 charging cost calculator

Estimate how much it costs to charge a Nissan Townstar EV Passenger L2 with its 45.0 kWh battery using your current charge level, target charge, and electricity price.

Nissan Townstar EV Passenger L2

45 kWh battery

Common charging scenarios

Home top-up

20% → 80% · 27.0 kWh

10.80

Road trip prep

10% → 90% · 36.0 kWh

14.40

Full battery estimate

0% → 100% · 45.0 kWh

18.00

Compare similar EVs

Popular EV charging cost pages

Explore model-specific charging estimates with built-in battery data for some of the most searched electric vehicles.

Battery capacity

45.0 kWh

Brand hub

Nissan EV model list

Charging estimate inputs

Current charge, target charge, and electricity price

Benchmark charging costs for Nissan Townstar EV Passenger L2

These fixed examples in pounds sterling (GBP) show how the 45.0 kWh battery translates into different charging sessions. The three tariffs are illustrative, not current UK averages. Charging losses and extra station fees are excluded. Change the currency and price in the calculator for your own estimate.

Home top-up

20% to 80% adds about 27.0 kWh to the battery.

£0.15 per kWh
£4.05
£0.25 per kWh
£6.75
£0.40 per kWh
£10.80

Road trip prep

10% to 90% adds about 36.0 kWh to the battery.

£0.15 per kWh
£5.40
£0.25 per kWh
£9.00
£0.40 per kWh
£14.40

Full battery estimate

0% to 100% adds about 45.0 kWh to the battery.

£0.15 per kWh
£6.75
£0.25 per kWh
£11.25
£0.40 per kWh
£18.00

Real-world charging losses for Nissan Townstar EV Passenger L2

A Nissan Townstar EV Passenger L2 20% to 80% session stores about 27.0 kWh in the battery. At the wall, the real energy draw can be higher because AC/DC conversion, battery conditioning, and cable losses all add overhead.

If 8% to 15% of the metered energy is lost, the same session would draw about 29.3 to 31.8 kWh. These percentages are illustrative assumptions, not measured efficiency for this model. Metered energy is battery energy divided by the fraction that reaches the battery. Use your charger’s billed kWh and actual tariff for a real session.

You can also browse the Nissan EV model list to compare how the 45.0 kWh battery in Nissan Townstar EV Passenger L2 sits alongside other models from the same brand.

20% to 80% wall-energy estimate

29.3 to 31.8 kWh

Based on 27.0 kWh stored in the battery divided by 0.92 to 0.85, assuming 8% to 15% of metered energy is lost.

How Charge Cost estimates Nissan Townstar EV Passenger L2 charging costs

1. Battery data

This page starts with the 45.0 kWh battery capacity listed for Nissan Townstar EV Passenger L2, so the baseline calculation is model-specific rather than generic.

2. Charge window

Your current charge and target charge determine how much battery energy is added. A smaller top-up costs less because fewer kWh need to be delivered.

3. Electricity price

The tool multiplies the required kWh by your price per kWh. If you pay more for public charging, taxes, or time-of-use tariffs, your real bill can be higher.

Frequently asked questions about charging a Nissan Townstar EV Passenger L2

How much does it cost to charge a Nissan Townstar EV Passenger L2?

Charge Cost helps estimate the charging cost of a Nissan Townstar EV Passenger L2 using its 45.0 kWh battery capacity, your current state of charge, target charge level, and electricity price. A full 0% to 100% battery estimate uses about 45.0 kWh before charging losses, so the cost changes directly with your electricity tariff.

What does a 20% to 80% charge add to a Nissan Townstar EV Passenger L2?

Nissan Townstar EV Passenger L2 needs about 27.0 kWh to move from 20% to 80% battery. At example electricity prices of £0.15, £0.25, £0.40 in GBP per kWh, that works out to roughly £4.05, £6.75, £10.80 in GBP before charging losses.

Does the Nissan Townstar EV Passenger L2 charging cost estimate include charging losses?

The base estimate for Nissan Townstar EV Passenger L2 focuses on battery energy and electricity price. Real-world wall energy can be higher, so a 20% to 80% session may require about 29.3 to 31.8 kWh if 8% to 15% of metered energy is lost. This is an illustrative assumption, not measured efficiency for this model.