Polestar EV charging cost page

Polestar 4 Long Range Dual Motor charging cost calculator

Estimate how much it costs to charge a Polestar 4 Long Range Dual Motor with its 94.0 kWh battery using your current charge level, target charge, and electricity price.

How much does it cost to charge a Polestar 4 Long Range Dual Motor?

Charging a Polestar 4 Long Range Dual Motor from 20% to 80% costs approximately £16.92 at an illustrative electricity price of £0.30/kWh (GBP). Using the calculator’s 94 kWh usable-capacity assumption, this adds 56.4 kWh of battery energy. Charging losses and additional station or session fees are excluded.

This is a fixed example in pounds sterling, not a current UK average tariff or a live quote. Enter your own price and charging range in the calculator below for a personal estimate.

Version: UK Long Range Dual Motor, model years 2024–2026.

Battery version and sources

Polestar lists a 100 kWh battery pack. This calculator uses the 94 kWh usable capacity reported by EV Database for the Long Range Dual Motor (MY24–26); the cited manufacturer specification does not confirm that usable figure. Pack capacity and energy available between 0% and 100% are different measures. Check your vehicle documentation when comparing versions.

Battery sources checked on :

Polestar 4 Long Range Dual Motor

94 kWh battery

Common charging scenarios

Home top-up

20% → 80% · 56.4 kWh

22.56

Road trip prep

10% → 90% · 75.2 kWh

30.08

Full battery estimate

0% → 100% · 94.0 kWh

37.60

Polestar 4 Long Range Dual Motor: home and public charging examples

The examples below use this page’s 94 kWh usable-capacity assumption. £0.30/kWh and £0.60/kWh are hypothetical GBP prices for comparing a home tariff with a public charger. They are not current UK averages or quotes from a charging network. Energy and costs exclude charging losses and additional fees.

Polestar 4 charging sessions at two illustrative electricity prices
SessionBattery energyHome example £0.30/kWhPublic example £0.60/kWh
Daily top-up (20% to 80%)56.4 kWh£16.92£33.84
Rapid-charge stop (10% to 80%)65.8 kWh£19.74£39.48
Full battery (0% to 100%)94.0 kWh£28.20£56.40

Why can the billed energy be higher?

The calculator and table count energy added to the battery. If, purely as an example, 10% of the energy measured by the charger is lost, only 90% reaches the battery. A 10% to 80% session then needs 65.8 ÷ 0.90 = 73.1 kWh from the charger, costing £43.87 at £0.60/kWh before any additional fees. This 10% loss is an assumption, not a measured Polestar 4 efficiency figure. Use your charger’s billed kWh and actual tariff to check a real session.

How long does a 10% to 80% rapid charge take?

The Polestar 4 UK 2025 manual gives approximately 30 minutes at a 200 kW DC station, with battery temperature around 25–30°C. That is a time estimate for a 10% to 80% session, not a constant 200 kW charging rate. Temperature, preconditioning, charging equipment and battery condition affect the result. Charging speed affects time; the billed kWh, tariff and any extra fees determine the price.

Compare with the Long Range Single Motor

Our Polestar 4 Long Range Single Motor calculator uses 94 kWh. At the same tariff and charge percentages, the cost follows the battery energy added, rather than the number of motors. This comparison does not estimate cost per mile, which also depends on driving consumption. You can also compare other Polestar models.

Charging reference checked on .

Compare similar EVs

Popular EV charging cost pages

Explore model-specific charging estimates with built-in battery data for some of the most searched electric vehicles.

Battery capacity

94.0 kWh

Brand hub

Polestar EV model list

Charging estimate inputs

Current charge, target charge, and electricity price

Benchmark charging costs for Polestar 4 Long Range Dual Motor

These fixed examples in pounds sterling (GBP) show how the 94.0 kWh battery translates into different charging sessions. The three tariffs are illustrative, not current UK averages. Charging losses and extra station fees are excluded. Change the currency and price in the calculator for your own estimate.

Home top-up

20% to 80% adds about 56.4 kWh to the battery.

£0.15 per kWh
£8.46
£0.25 per kWh
£14.10
£0.40 per kWh
£22.56

Road trip prep

10% to 90% adds about 75.2 kWh to the battery.

£0.15 per kWh
£11.28
£0.25 per kWh
£18.80
£0.40 per kWh
£30.08

Full battery estimate

0% to 100% adds about 94.0 kWh to the battery.

£0.15 per kWh
£14.10
£0.25 per kWh
£23.50
£0.40 per kWh
£37.60

Real-world charging losses for Polestar 4 Long Range Dual Motor

A Polestar 4 Long Range Dual Motor 20% to 80% session stores about 56.4 kWh in the battery. At the wall, the real energy draw can be higher because AC/DC conversion, battery conditioning, and cable losses all add overhead.

If 8% to 15% of the metered energy is lost, the same session would draw about 61.3 to 66.4 kWh. These percentages are illustrative assumptions, not measured efficiency for this model. Metered energy is battery energy divided by the fraction that reaches the battery. Use your charger’s billed kWh and actual tariff for a real session.

You can also browse the Polestar EV model list to compare how the 94.0 kWh battery in Polestar 4 Long Range Dual Motor sits alongside other models from the same brand.

20% to 80% wall-energy estimate

61.3 to 66.4 kWh

Based on 56.4 kWh stored in the battery divided by 0.92 to 0.85, assuming 8% to 15% of metered energy is lost.

How Charge Cost estimates Polestar 4 Long Range Dual Motor charging costs

1. Battery data

This page starts with the 94.0 kWh battery capacity listed for Polestar 4 Long Range Dual Motor, so the baseline calculation is model-specific rather than generic.

2. Charge window

Your current charge and target charge determine how much battery energy is added. A smaller top-up costs less because fewer kWh need to be delivered.

3. Electricity price

The tool multiplies the required kWh by your price per kWh. If you pay more for public charging, taxes, or time-of-use tariffs, your real bill can be higher.

Frequently asked questions about charging a Polestar 4 Long Range Dual Motor

How much does it cost to charge a Polestar 4 Long Range Dual Motor?

Charge Cost helps estimate the charging cost of a Polestar 4 Long Range Dual Motor using its 94.0 kWh battery capacity, your current state of charge, target charge level, and electricity price. A full 0% to 100% battery estimate uses about 94.0 kWh before charging losses, so the cost changes directly with your electricity tariff.

What does a 20% to 80% charge add to a Polestar 4 Long Range Dual Motor?

Polestar 4 Long Range Dual Motor needs about 56.4 kWh to move from 20% to 80% battery. At example electricity prices of £0.15, £0.25, £0.40 in GBP per kWh, that works out to roughly £8.46, £14.10, £22.56 in GBP before charging losses.

Does the Polestar 4 Long Range Dual Motor charging cost estimate include charging losses?

The base estimate for Polestar 4 Long Range Dual Motor focuses on battery energy and electricity price. Real-world wall energy can be higher, so a 20% to 80% session may require about 61.3 to 66.4 kWh if 8% to 15% of metered energy is lost. This is an illustrative assumption, not measured efficiency for this model.